Skip to content

Unlink an Enrichment Destination

Unlinking removes the connection between a source datastore and its enrichment destination. Future Scans continue without writing anything there. Materialize and datastore Export are unavailable until a destination is linked again, and automatic Sync/Profile stops for this source. Everything already written stays in the destination.

Permission Required

You need the Admin user role to unlink. See the Permissions page for details.

Before Unlinking

You cannot unlink while the source datastore has Export or Materialize operations in a flow or on a schedule. Remove those first, through Flows or the scheduled operations.

Switching destinations?

To move the datastore to a different destination you do not need to unlink. Open the same dialog, pick another datastore under Use existing, and save. See Link an Enrichment Destination.

What Happens When You Unlink

For what happens to the written outputs, whether you can re-link, and how to clean up, see Unlinking.

Steps

Step 1: Navigate to the Overview page of the source datastore.

Step 2: Click the Settings button at the top-right corner.

Step 3: Click Enrichment in the dropdown menu.

Step 4: The Enrichment Destination dialog appears, with the current destination selected.

Step 5: Click Unlink enrichment destination next to the selected destination.

Step 6: The Unlink Enrichment Destination confirmation appears. Click Unlink.

Step 7: A success message confirms that the destination has been unlinked.

Link an Enrichment Destination

To link a destination again, see the Link an Enrichment Destination documentation.